Best viewed in Portrait mode.

VM No.20 - Reducing Well Life-cycle Costs

This was a 2½-3 hour long Virtual Meeting (VM) phone-in (no face-to-face element).  


Tullow Ghana Smart Completions Case Study - Kevin Burke, Tullow Lead Completions & Testing Engineer

Innovative E-line Technology with Potential in Well Abandonment Based on Epoxy Plug in Annulus – Paul Howlett, Managing Director, Sudelac

The case for IWC in Deepwater - Audi Okullo, MCP Completion Engineer Advisor, Chevron

Audio Okullo, Chevron Houston Kevina Bland, Chevron Houston Roy Cramer, Chevron Houston Jesse Constantine, Eric Petersen, Trey Gilbert, ConocoPhillips Houston Don Dressler, Enterprise Performance Group LLC Houston Mark Wong, Oilsearch Australia Amol Argawal, Shell Gabon Paul Howlett, Sudelac Aberdeen Kevin Burke, Tullow Oil London Klisthenis Dimitriadis, Tullow Oil London
© Win Cubed 2018
Tel: (44) 1494 673339
Design by Imajica