Best viewed in Portrait mode.

Select a title from the list below to find out more information about the meeting.

Meetings - Current


Meetings - Archive

Date Title
29/03/2017 VM No.22 - OGIC Well Abandonment Technologies Update/SUDELAC DP Cement Head Overview
22/11/2016 VM No.21 - Modern Perforation Techniques: Key to Unlocking Reservoir Potential
29/06/2016 HTM #44 - INNOVATIVE APPROACHES TO WELL ABANDONMENT
21/03/2016 VM No.20 - Reducing Well Life-cycle Costs
01/12/2015 VM No.19 - The Challenges of Well Abandonment in a Low Oil Price Environment
21/10/2015 HTM #43 - THE CHALLENGES OF COMPLETIONS, INTERVENTIONS, AND WELL ABANDONMENT IN A LOW OIL PRICE ENVIRONMENT
10/02/2015 HTM #42 - Well Integrity and Subsea Wells Best Practices
11/11/2014 HTM #41 - Well Integrity: Evolving Standards
10/08/2011 VM#18 - SHARING OF COMMON INDUSTRY WELL INTEGRITY PROBLEMS
01/06/2011 SBM #5 – Downhole Control Line Wet Connectors: Hydraulic, Electric And Fibre Optic Connectors….Are They Reliable Completion Options Today?
06/04/2011 sbm #4 - Follow-Up Meeting On Hydraulic Fittings
26/01/2011 VM#17 - WHAT IS “BEST PRACTICE” FOR WELL BARRIERS DURING WELL OPERATIONS (EITHER DESIGNED UPFRONT OR ACCEPTED IN LATER LIFE BY RISK ASSESSMENT)?
03/11/2010 VM #16 - INFLOW CONTROL DEVICES (ICDS), SWELLABLE PACKERS AND SCREENS: APPLICATIONS PRIMER/UPDATE, MODELLING AND RECENT TECHNOLOGY ADVANCES.
11/08/2010 VM #15 - IS IT TIME TO REVIEW SAND CONTROL DESIGN GUIDELINES?
25/03/2010 HTM #38 - Well integrity corporate policy and guidlines also including managing wells which have lost their integrity
24/02/2010 SBM #3 - Gas well de-liquification session, foamer treatments, capillary strings for foamers
11/11/2009 SBM #2 - Positive inflow test on the liner lap
11/11/2009 SBM #1 - EXPERIENCES AND FUTURE POTENTIAL FOR ELECTRONIC/REMOTELY OPERATED COMPLETION TOOLS
23/09/2009 VM #14 - OPEN HOLE COMPLETIONS WITH SAND CONTROL: WHAT'S NEW?
03/06/2009 HTM #37 - LIGHT WEIGHT SUBSEA INTERVENTIONS - INLCUDING ABANDONMENT AND ONGOING VERIFICATION OF SUBSEA WELLS
25/03/2009 HTM #36 - HPHT COMPLETIONS UPDATE: HPHT COMPLETION DESIGN, RELIABILITY AND EARLY PRODUCTION OPERATIONS EXPERIENCE
28/01/2009 VM #13 - SLICK LINE OPERATIONS - THE EXPANDING RANGE OF USES AND CHANGING LIMITATIONS
02/12/2008 HTM #35 - OPEN HOLE COMPLETIONS – FLUID SELECTION AND FLUID LOSS CONTROL (INCLUDING EXPERIENCES WITH LINER TOP ISOLATION DEVICES)
05/03/2008 HTM #34 - INTELLIGENT COMPLETIONS: SHARING VALUE ADDED AND LESSONS LEARNED
23/01/2008 VM #10 - Wellbore Clean Up. Where We Came From, Where We Are Now And Have We Come Too Far?
30/10/2007 HTM #32 - MORE ON SUBSEA WELL INTERVENTION
17/07/2007 VM #9 - Sand Control: Gravel Pack v Frac Pack v Expandables v Screens v Slotted Liner. How Do Operators Select The Optimum Sand Control Technology For Their Well?
13/06/2007 HTM #31 - DESIGNING COMPLETIONS FOR INTERVENTIONS, SIDETRACKS, CTD, TTRD AND ABANDONMENT
17/05/2007 HTM #30 - EXTREMELY DEEP AND EXTREME DEEPWATER COMPLETIONS - CHALLENGES, TECHNOLOGY GAPS AND POTENTIONAL SOLUTIONS
26/03/2007 VM #7 - ANNULUS MANAGEMENT: LONG TERM SUSTAINED CASING PRESSURE MANAGEMENT AND PROGRESS TOWARDS PERMANENT CURES - Phone-In Downloads
22/03/2007 VM #8 - Subsea Well Intervention Progress
14/03/2007 HTM #29 - UPDATE ON INTELLIGENT / ADVANCED WELL COMPLETIONS
06/11/2006 HTM #27 - PERFORATING
05/10/2006 HTM #28 - CAN WE SPEED UP THE ADOPTION OF ZONAL ISOLATION IN UN-CEMENTED LINERS WITH OPENHOLE PACKERS / SWELL PACKERS / NEW ECP DESIGNS AND ALTERNATIVES TO INFLATABLE BRIDGE PLUGS?
12/07/2006 VM #6 - Produced Water Re-Injection (PWRI) Well Completions, Operations and Interventions
04/05/2006 VM #5 - WATER/GAS MANAGEMENT AND ZONAL CONTROL IN CONVENTIONAL SAND CONTROL COMPLETIONS
20/02/2006 VM #4 - EFFECTIVELY MANAGING RISK IN WELL INTERVENTIONS
23/11/2005 VM #3 - Life of Well Completions Designs - Fact or Fiction?
23/08/2005 HTM #26 - Completion Design, Intervention And Workover Best Practice Knowledge Management
22/06/2005 VM #2 - Dynamic Underbalanced Perforating - Presentation Gallery.
01/03/2005 HTM #25 - WATER INJECTOR PLACEMENT, COMPLETION SELECTION AND MANAGEMENT.
10/02/2005 DM #1 - THE VALUE OF DOWNHOLE SHUT-OFF DEVICES
09/12/2004 HTM #24. COILED TUBING STEP CHANGES – WHAT’S COMING, WHAT WORKS ELSEWHERE, AND WHAT DO YOU WANT TO SEE NEXT?
03/11/2004 VM #1 - Question# 386 - SCSSVs In Subsea Wells:Review Update - Follow Up Virtual Meeting By Audioconference
06/05/2004 HTM #23 - MANAGING THE LOSS OF WELL INTEGRITY THROUGH TO ABANDONMENT
11/12/2003 HTM #22 - Through Tubing Drilling and Completions
02/10/2003 HTM #21 - INTELLIGENT/ADVANCED COMPLETIONS
18/03/2003 HTM #20 - MAXIMISING WELL PRODUCTIVITY FROM THE EXISTING WELLSTOCK
29/01/2003 HTM #19 - EXPANDABLE TECHNOLOGY REVIEW
13/11/2002 HTM #18 - MANAGING THE INTEGRITY OF OLD WELLS
06/06/2002 HTM #17 - "LIVING WITH SAND" - SAND MANAGEMENT IN HPHT, GAS BLOWDOWN, SUBSEA AND WATER INJECTION SITUATIONS.
20/03/2002 HTM #16 - INTERVENTION TECHNOLOGY ADVANCES : UPDATE ON TRACTORS FOR SLICKLINE, WIRELINE AND COILED TUBING
28/02/2002 HTM #15 - ALTERNATIVES TO GAS LIFT, GAS LIFT OPTIMISATION AND GAS LIFT BEST PRACTICE
07/11/2001 HTM #14 - DEEPWATER WELLS - INTERVENTION CAPABILITIES - COMPLETION BEST PRACTICES.
09/05/2001 HTM #13 - HPHT Sand Control Breakthrough Workshop
27/02/2001 HTM #12 - Sand Face Completion Design, Detecting Failures, Doing Remedial Work
14/12/2000 HTM #11 - HPHT COMPLETION DESIGN, SAND CONTROL AND WELL INTERVENTION.
06/10/2000 HTM #10 - DUAL PURPOSE, CROSSOVER-TYPE, PRODUCER-INJECTOR COMPLETIONS. LICENCE TO OPERATE ISSUES - COMPLETION DESIGN FACTORS, WORKING WITHIN THE LEGISLATIVE ENVELOPE, STAFF COMPETENCE.
25/05/2000 HTM #8 - SUBSEA COMPLETIONS PERFORMANCE IMPROVEMENT
15/05/2000 HTM #9 - EXTENDED REACH WELL INTERVENTIONS
12/12/1999 HTM #7 - DUAL PURPOSE, CROSSOVER-TYPE, PRODUCER-INJECTOR COMPLETIONS.
04/06/1999 HTM #5 - WIRELINELESS COMPLETIONS - WHERE ARE WE AT ?
16/03/1999 Salt Drilling Meeting Report
03/03/1999 HTM #6 - Low Cost Low Tech Completions for North Sea Operations
17/02/1999 HTM #4 - Reducing the Impact on Debris on Completion NPT
19/11/1998 HTM #3 - The Impact of Mud on Production Success
24/06/1998 HTM #2 - Scale Management Hot Topic Meeting
22/04/1998 HTM #1 - Water Shut Off Hot Topic Meeting
03/12/1997 December 1997 Workshop
© Win Cubed 2018
Tel: (44) 1494 673339